Period

Schema

startDate:

string, Date

OpenContracting Description: The start date for the period.

endDate:

string, Date

OpenContracting Description: The end date for the period.

startDate should always precede endDate.

Date

Date/time in Date Format: ISO 8601.

Value

Schema

amount:

float, required

OpenContracting Description: Amount as a number.

Should be positive.

currency:

string, required

OpenContracting Description: The currency in 3-letter ISO 4217 format.

valueAddedTaxIncluded:
 

bool, required

Revision

Schema

date:

string, Date

Date when changes were recorded.

changes:

List of Change objects

Guarantee

Schema

amount:

float, required

OpenContracting Description: Amount as a number.

Should be positive.

currency:

string, required, default = UAH

OpenContracting Description: The currency in 3-letter ISO 4217 format.